What should you decide before you start looking?
Before comparing anyone, be clear about three things: what you want to build, roughly what you can spend, and when you'd like to start on site. A short written brief, even a page of notes, makes first conversations far more useful. Our free brief builder takes about 15 minutes and gives you a PDF you can share with anyone you speak to.
Then decide what kind of help you need. Some people want a full service from first sketches to completion. Others need planning drawings only, or Building Warrant drawings for a design they already have.
Look for someone with completed homes like yours, experience with Stirling Council and its conservation areas, professional indemnity insurance and a clear written fee proposal. In Scotland they don't have to be an architect: architectural technologists and architectural designers also design homes and prepare planning and warrant applications.
Does it have to be an architect?
No. The title "architect" is protected by the Architects Act 1997, so only people registered with the Architects Registration Board (ARB) can use it, but the design work isn't reserved. In Stirling, as across Scotland, homes and extensions are designed by architects, Chartered Architectural Technologists and architectural designers. If someone calls themselves an architect, you can check them on ARB's online register. See architect, architectural designer or technologist.
Do they know Stirling's planning context?
Local knowledge saves time. Ask about their experience with:
- Stirling Council's planning policies, including its householder guidance on extensions and its policies for housing in the countryside. See housing in the countryside in Stirling.
- Conservation areas. Stirling Council lists 26 conservation areas, including Stirling Town and Royal Park, Kings Park, Bridge of Allan and Dunblane. Householder permitted development rights for extensions don't apply in conservation areas, so most extensions there need planning permission.
- Listed buildings, which need listed building consent for an extension. See extending a listed building.
- The National Park. Part of the Stirling Council area lies in Loch Lomond & The Trossachs National Park, where the National Park Authority, not the council, decides planning applications. See building in the National Park.
- Building Standards. Stirling Council aims to issue a technical response or the Building Warrant within 20 working days of a valid application. A complete, well-coordinated application is the best way to stay within that.
Can they show you homes like yours?
Ask to see completed projects of a similar type and setting, and how each one got through planning. A portfolio of large new houses tells you little about extending a 1930s semi, and the reverse. Ask for references and, where possible, speak to past clients about how the design, planning and costs went.
Who will actually do the work?
In some practices the person you meet is not the person who designs your home. Ask who will lead your project day to day, who prepares the drawings and who you call when the builder has a question.
Do they hold professional indemnity insurance?
Professional indemnity insurance protects you if a design error causes a loss. ARB requires registered architects to hold it. For anyone else, ask directly and ask what level of cover is held.
How are the fees worked out?
Design fees are usually a percentage of the build cost, a fixed fee, an hourly rate or a mix. Ask for a written proposal that sets out:
- the stages included, from brief to planning, Building Warrant and construction;
- what is excluded, such as the structural engineer, surveys and specialist reports;
- how many design revisions are included;
- what happens if planning is refused or the scope changes.
Our fee guide shows illustrative fixed-stage fees, including a 60m² kitchen extension in Stirling at £16,100 plus VAT for all eight stages, and a new home in Stirlingshire. See also extension design fees in Scotland.
Will you get a written appointment?
Before work starts, you should have a written appointment: the scope, fee, payment terms, programme, insurance and how either side can end the agreement. Don't rely on an email exchange.
Questions to ask at a first meeting
- Which recent projects are most like mine, and can I see them?
- What do you see as the main planning risks on my site?
- Is your fee fixed for each stage, or a percentage of the build cost?
- Are the engineer and surveys included?
- How long will the design and approvals take?
- How involved will you be once building starts?
How we help
ED Design is an architectural design studio based at 20 Victoria Place, Stirling. We design extensions in Stirling, self-build homes and replacement dwellings, with work across Stirling, Dunblane and Bridge of Allan. Every project is led by Chris Eadie, on fixed fees agreed stage by stage.
Sources: Architects Act 1997, section 20; Stirling Council: conservation areas; Stirling Council: building standards performance; Stirling Council: planning guidance; Scottish Government: Circular 1/2024. Last reviewed November 2026.
Questions
Do I need an architect to build an extension in Stirling?
No. Scottish law doesn't require an architect for planning or Building Warrant applications. Architectural technologists and architectural designers can prepare the same applications.
Who decides planning applications in Stirling?
Stirling Council, except for sites inside Loch Lomond & The Trossachs National Park, where the National Park Authority is the planning authority.
Is Kings Park in Stirling a conservation area?
Yes. Kings Park is one of the conservation areas listed by Stirling Council, so extensions there generally need planning permission.
How long does a Building Warrant take in Stirling?
Stirling Council aims to give a technical response or issue the warrant within 20 working days of a valid application. The overall time depends on how many queries need answering.
Where is ED Design based?
At 20 Victoria Place, Stirling FK8 2QT. Call 01786 388773 for a free initial call.
General guidance for Scotland, not legal, tax, financial or planning advice for your project. Rules change, so check current official guidance and take advice specific to your site before acting.