How do architects and designers charge for an extension?
There is no official fee scale for extensions in Scotland, and architects, architectural technologists and architectural designers all set their own fees. Most use one of three methods, or a mix:
| Percentage of build cost | Fixed fee | Hourly or daily rate | |
|---|---|---|---|
| How it works | A percentage of the construction cost | An agreed price for a defined scope, often stage by stage | Time charged at an agreed rate |
| When you know the total | Once builders' prices are in | Before each stage starts | As the work is done |
| If build costs rise | The fee usually rises too | The fee stays as agreed for the scope | No direct link |
| Best suited to | Larger or less defined projects | Homeowners who want budget certainty | Early advice, surveys and small tasks |
Percentage fees for extensions are often quoted higher than for new houses, because the work of surveying, designing around and connecting to an existing building is spread over a smaller construction value. Treat any single percentage you read with caution: what matters is what the fee includes.
Compare design fees on the stages and services included, not the headline figure. As an illustration, our fee guide shows a 60m² single-storey kitchen extension in Stirling with an illustrative fixed-stage total of £16,100 plus VAT for all eight stages.
What does a 60m² extension cost to design? A worked example
This is the extension example from our fee guide: a single-storey kitchen extension of about 60m² in Stirling, with an estimated build cost of £130,000. The figures are illustrative; your own fee depends on the house, the site and the stages you appoint.
| Stage | Illustrative fixed fee |
|---|---|
| 01 Project brief | £800 |
| 02 Concept and schematic design | £2,000 |
| 03 Cost review and budget testing | £600 |
| 04 Planning application | £3,500 |
| 05 Detailed design | £4,000 |
| 06 Building Warrant application | £1,200 |
| 07 Construction documentation | £1,500 |
| 08 Construction-stage support | £2,500 |
| Illustrative total, all eight stages | £16,100 + VAT |
For comparison, a 12% percentage fee on the same £130,000 estimate would be £15,600. If the builder's price came in 15% higher, at £149,500, the same 12% fee would rise to £17,940, while a fixed-stage fee for the same scope would stay as agreed.
On smaller extensions like this, the totals are broadly similar. The difference is when you know the figure. Many clients appoint only some stages: for example stages 1 to 4 to reach a planning decision, or stages 5 and 6 for Building Warrant drawings where planning is already in place.
What makes an extension design fee higher or lower?
- Scope: planning drawings only, or planning, warrant, tender and construction support.
- The existing house: a traditional stone house or a building with past alterations needs more survey and investigation.
- Designations: a conservation area or listed building adds design development, consultation and conditions. See extending in an Edinburgh conservation area.
- Structure: removing walls, two-storey extensions and difficult ground need more coordination with the engineer.
- Planning risk: pre-application advice, revisions and any review add time.
What other fees should you budget for?
Design fees rarely cover everything. Budget separately for:
| Item | Typical cost |
|---|---|
| Householder planning application | £371 (Scotland, from April 2026) |
| Building Warrant | Set nationally by value of work: £1,651 for £130,000 of work, before certification discounts |
| Listed building consent | No application fee |
| Structural engineer | Varies with the structure; our fee guide gives £3,000–£8,000 as a typical range |
| Measured or topographical survey | Typically £500–£1,500 |
| Specialist reports, such as bats or drainage | Typically £400–£1,200 each, where needed |
Third-party ranges are typical for central Scotland in 2026 and vary by site. See Building Warrants for extensions and how much an extension costs.
How do you compare fee proposals?
- Check both proposals cover the same stages, from brief to construction.
- Check whether the engineer, surveys and energy calculations are included.
- Check how many design revisions are included and how extra work is charged.
- Check what happens if planning is refused.
- Check whether the fee is fixed, or linked to the build cost.
- Ask about professional indemnity insurance and get a written appointment.
Whether the proposal comes from an architect, an architectural technologist or an architectural designer, the same checks apply. See architect, architectural designer or technologist.
Is VAT charged on extension design fees?
VAT-registered designers charge VAT on their fees at the standard rate. Most building work on an extension to an existing home is also standard-rated. Take specific advice if your project might qualify for a different rate.
How we help
ED Design charges a fixed fee for each stage, agreed in writing before the stage begins, for extensions and renovations across Scotland, including Stirling and Edinburgh. See the full stage list on our fees page.
Sources: ED Design: fee guide 2026, worked example C; The Building (Fees) (Scotland) Amendment Regulations 2026 (SSI 2026/7); Fife Council: scale of planning fees, April 2026. Last reviewed November 2026.
Questions
How much does an architect charge for an extension in Scotland?
There's no fixed scale. Fees depend on the stages included and the complexity of the house. As an illustration, ED Design's fee guide shows £16,100 plus VAT for all eight stages on a 60m² single-storey kitchen extension in Stirling.
Are design fees for extensions a percentage of the build cost?
Sometimes. Many practices charge a percentage, others a fixed fee per stage or an hourly rate. A fixed-stage fee doesn't rise if the builder's price does.
Can I appoint a designer just for planning drawings?
Yes, many designers offer individual stages. Make sure the planning design will also work for the Building Warrant, to avoid redesign later.
How much is a Building Warrant for an extension?
It's set nationally from the value of the work. For £130,000 of work it's £1,651 before any certification discount.
Is the structural engineer included in the design fee?
Not always. Check each proposal, and budget for the engineer separately if they're excluded.
General guidance for Scotland, not legal, tax, financial or planning advice for your project. Rules change, so check current official guidance and take advice specific to your site before acting.



